Captain’s Log – 9th Day of Etoch, 416/G Ebaran Arrived MarqIV low on fuel. As much as I’d like to follow-up on Clipper’s lead, we’re
Author: nanaba

With the tail done, seemed like time to break the seal before the inertia became incalcuable. 45 minutes of base coating and I hit one

The undercut wadding helped a lot on the side seams, but the fin join was so. much. bulk. One needle break and at least four

B-side quilted. Still undecided on the zipper, but leaning towards French seams. Had solids left from the jelly roll, but nothing patterned. Pulled apart the

Side two basted and fused. Ended up piecing together muslin scraps into an extra back, which makes a decent pattern for the wadding. Need to

Debating cutting another piece of muslin backing to use for side two layout. Side one had both backs available, so the layout on one could

Been a while since I went full floor troll. Can’t start the layout without knowing there are enough scales or the patterns will end up

Clocking a lot of time with the thread snips on this one. Test run was workable; chain stiched in opposition to prevent bowing. Definitely streamlined

Finally clear to start a new project; feels like forever. Plenty of lessons learned on the prototype to streamline this process. I hope. I could

Still plenty of organizing to do in the lab, but that’s a battle that never ends. Measurements and layout were spot on. wtf would I

The weather arrived and the world ground to a halt for two beats. Chaos begins anew on the downbeat. The oil paints are not going